Monday, 17 Nov 2025
The Standard Maldives
  • News
  • Business
  • Politics
  • Travel
  • Technology
  • World
  • Reports
  • 🔥
  • President Dr. Mohamed Muizzu
  • STELCO
  • Maldives Police Service
  • The President's Office
  • Tourism Ministry
  • Maldives Parliament
Font ResizerAa
The Standard MaldivesThe Standard Maldives
  • My Saves
  • My Interests
  • History
  • My Feed
  • Business
  • News
  • Politics
  • Reports
  • Technology
  • Travel
  • World
Search
  • My Saves
  • My Interests
  • History
  • My Feed
  • Business
  • News
  • Politics
  • Reports
  • Technology
  • Travel
  • World
Follow US
© 2024 Dominion Network
News

Mihaaru reported cracks start appearing in newly built FDC flats in Hulhumale, contracted by past government

By Ahmed Ashraf Published 14 hours ago

Some residents moving into the newly completed Hulhumalé Phase 2 housing towers built by Fahi Dhiriulhun Corporation have begun expressing concerns about cracks appearing across several units, according to a report by local daily Mihaaru. FDC has confirmed that the issues are minor, non structural, and will be repaired within the contractor’s Defect Liability Period.

Mihaaru reported that only a limited number of households currently occupy Tower 14 of Amaan Udhares, part of the 4,000 unit housing project constructed through two Indian contractors. Residents who moved in around two months ago observed cracks on interior walls and exterior surfaces. Similar cracks have been seen in Towers 12 and 13, where finishing works remain ongoing.

- Advertisement -

FDC Managing Director Hamdhaan Shakeel said these early stage issues commonly appear when utilities activate and buildings undergo natural settlement. He noted that all defects will be addressed within the Defect Liability Period, which obligates contractors to resolve such matters after project completion.

Hamdhaan stressed that the buildings pose no structural danger and urged residents to report any defects promptly so engineering teams can respond without delay.

FDC Chief Development Officer Hassan Maanih Umar explained that the cracks are age related and finishing related, often linked to temperature shifts and the settling process typical in high rise structures. He confirmed that rectification work is being carried out.

Electricity supply to Towers 11, 12 and 13 was completed late last month, with water connections expected soon, allowing key handovers to proceed. The development comprises 32 towers of 17 and 18 floors, offering two bedroom and three bedroom apartments. FDC has stated that handover of all units will be completed by the end of December.

Share This Article
X Email Copy Link Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

- Advertisement -
Ad imageAd image

You Might Also Like

NewsTravel

Seaplane Shutdown Looms: MATATO Warns TMA Pilot Strike Could Paralyze Maldives Tourism

By Ahmed Ashraf
News

A Diplomatic Triumph: Maldives Secures UNGA Vice Presidency — Muizzu Vows Stronger Global Partnerships

By Ahmed Ashraf
BusinessNews

BML Fund Invests in Education with New SEN Facility in Th. Veymandoo

By Ahmed Ashraf
NewsPolitics

President Muizzu Champions Fair Funding: New Formula to Empower All Councils

By Ahmed Ashraf
The Standard Maldives
Facebook Twitter Instagram

About Us


“The Standard Maldives” is your premier source for the latest news, insights, and stories from the Maldives. With a commitment to accuracy and independence, we bring you comprehensive coverage of local developments, regional events, and global perspectives that impact our island nation. From breaking news to in-depth analyses, we aim to inform, inspire, and engage. Proudly carrying the tagline, ‘The World’s Window on Maldives,’ we connect the Maldives to the world and the world to the Maldives. Stay informed, stay connected.”

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?