Monday, 5 Oct 2026
The Standard Maldives
  • News
  • Business
  • Politics
  • Travel
  • Technology
  • World
  • Reports
  • 🔥
  • President Dr. Mohamed Muizzu
  • STELCO
  • Maldives Police Service
  • The President's Office
  • Tourism Ministry
  • Maldives Parliament
Font ResizerAa
The Standard MaldivesThe Standard Maldives
  • My Saves
  • My Interests
  • History
  • My Feed
  • Business
  • News
  • Politics
  • Reports
  • Technology
  • Travel
  • World
Search
  • My Saves
  • My Interests
  • History
  • My Feed
  • Business
  • News
  • Politics
  • Reports
  • Technology
  • Travel
  • World
Follow US
© 2024 Dominion Network
News

MTCC awarded Villingili dinghy jetty and coastal protection projects

By Hussain Shinan Published August 17, 2026

Maldives Transport and Contracting Company (MTCC) has been contracted to develop a new dinghy jetty and carry out coastal protection works in Villingili, with both projects scheduled to be completed within six months.

The Ministry of Construction and Infrastructure announced that separate agreements for the two projects were signed with MTCC on Monday.

State Minister Ismail Hameed signed the agreements on behalf of the ministry, while MTCC Managing Director Ahmed Saudy signed on behalf of the state-owned contractor.

- Advertisement -

Under the first project, a new dinghy jetty will be developed on the northern side of Villingili. MTCC has been given five months to complete the works.

The project will involve dredging 3,698 cubic metres from the harbour basin and channel, alongside the construction of a 74-metre quay wall equipped with a ramp and stairs.

MTCC will also construct a 24-metre rock boulder breakwater and install a three-metre rock boulder revetment. A 74-metre-long, two-metre-wide concrete jetty will also be developed as part of the project.

The second agreement focuses on coastal protection works at several locations around Villingili and carries a six-month completion period.

As part of the project, beach nourishment will be undertaken across an area of approximately 1.1 hectares.

The coastal protection infrastructure will include a 150-metre rock boulder revetment and a 181-metre submerged rock boulder breakwater. MTCC will also remove a 60-metre section of an existing breakwater.

The latest projects form part of ongoing government efforts to improve harbour and coastal infrastructure across the country, particularly in communities facing erosion and requiring safer access for smaller vessels.

Share This Article
X Email Copy Link Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

- Advertisement -
Ad imageAd image

You Might Also Like

News

MMA Tightens Monetary Policy to Support Rufiyaa, Ease Pressure on US Dollar Rate

By Hussain Shinan
News

Maldives secures $50 million loan from U.S. firm amid economic challenges

By Ahmed Ashraf
BusinessNews

Dhiraagu Awards First Speedboat in ‘Win 2 Speedboats’ Promotion

By Ahmed Ashraf
News

A Ramadan Gift from President Muizzu: 48 Cans of Fish for Every Family!

By Ahmed Ashraf
The Standard Maldives
Facebook Twitter Instagram

About Us


“The Standard Maldives” is your premier source for the latest news, insights, and stories from the Maldives. With a commitment to accuracy and independence, we bring you comprehensive coverage of local developments, regional events, and global perspectives that impact our island nation. From breaking news to in-depth analyses, we aim to inform, inspire, and engage. Proudly carrying the tagline, ‘The World’s Window on Maldives,’ we connect the Maldives to the world and the world to the Maldives. Stay informed, stay connected.”

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?